Altona Meadows VIC. AUS
Installation of Main Switchboard & Safety Switches
The Customer requested to wire in supply & install 16mm sub-main circuit 25 meters from the main switchboard to shed through raiser bracket between carport & shed - This includes switchboard in the shed with power & light safety switch (Corry/conduit for hole run) Wire in supply & install 20 Amp circuit for lathe & mill on own circuit - protected by a safety switch with isolator Wire in supply & install 20 Amp GPO for a welder on own circuit - protected by safety switch Wire in supply & install hot water service on own circuit - protected by safety switch Wire in & install a customer supplied light - provide a switch Wire in & install a customer supplied light - connect to existing Wire in supply & install DGPO in the shed Wire in supply & install WPDGPO on shed Wire in & connect tree 5kw Air Conditioner back to switchboard - protected by safety switch Supply & install Gree 5kw split system air conditioner
October 12, 2021
Wire in, supply & installation for the main switchboard to shed with power and light safety switch professionally completed. Wire in supply & installation of 20AMP circuit for Lathe & Mill, 20 AMP circuit GPO for welder, installation of hot water service, customer supplied lights by proving a switch, customer supplied light connected to the existing switches, installed DGPO in the shed, WPDGPO on the shed, connected a 5kw A/C back to the switchboard, and installed Gree split system A/C along with safety switches.